# Rulings Panel decision on Code breach by Genesis Energy

Date: 16 Nov 2026
Released by: Electricity Authority

## MediaRelease.co Summary

The Electricity Rulings Panel has fined Genesis Energy $301,875 for breaching the Electricity Industry Participation Code by failing to follow System Operator dispatch instructions for Huntly unit 5 during two trading periods on 26 January 2024. Genesis admitted the breach after an Electricity Authority complaint lodged in December 2025. It is the Panel's highest pecuniary penalty to date, and Genesis must also pay $9,937.50 in costs.

## Original release

The Rulings Panel has ordered Genesis Energy to pay a fine of $301,875 after finding it breached the Electricity Industry Participation Code 2010 (Code) by failing to comply with dispatch instructions. The independent Panel, which deals with complaints about breaches of the Code, found that Genesis had failed to comply with dispatch instructions for Huntly unit 5 during two separate trading periods on 26 January 2024. Genesis admitted it had breached clause 13.82(2) of the Code. Dispatch instructions are the instructions the System Operator issues to generators to provide generation. Compliance with dispatch instructions is critical for: - maintaining the stability, reliability and efficiency of the power system - ensuring sufficient electricity supply to meet demand at all times - ensuring fair and transparent operations and avoiding the risk of price distortion. Where a generator is not aligned with dispatch instruction then the system’s ability to respond to other system events is impacted. The Electricity Authority Te Mana Hiko (Authority) lodged a formal complaint over the alleged breach with the Rulings Panel in December 2025. The fine is the highest pecuniary penalty order made by the Rulings Panel. On 1 September 2022 an amendment to the Electricity Industry Act 2010 increased the maximum penalty for Code breaches to $2 million. The Panel also ordered Genesis to pay the Authority’s costs of $9,937.50.

## Key details

- Issued by: Electricity Authority
- Published: 16 Nov 2026
- Publisher country: New Zealand
- Subject country/region: New Zealand

Original source: https://www.ea.govt.nz/news/press-release/rulings-panel-decision-on-code-breach-by-genesis-energy/
MediaRelease.co canonical URL: https://mediarelease.co/nz/mr02985-rulings-panel-decision-on-code-breach-by-16112026.html